Excavator Auger for Efficient Drilling | WFMS-02 Soil Mixing Arm

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000
Excavator Auger-Core Accessories for Engineered Efficient Drilling

Excavator Auger-Core Accessories for Engineered Efficient Drilling

It is a necessary tool for foundation construction, afforestation, pipeline laying, mine exploration and other scenarios through the rotary cutting of spiral blades to achieve rapid hole formation.It can convert the power of excavator into drilling force efficiently, and completely replace the inefficient drilling method of traditional manual or small equipment.
Get A Quote

Advantages of Excavator Auger

High-strength alloy structure, easy to deal with complex geology

The drill pipe and spiral blade are made of * * high hardness and low alloy structural steel * *. After the whole quenching and tempering heat treatment, the hardness reaches HB300-350, and the torsional strength is increased by more than 50%.The wear-resistant alloy layer is welded on the edge of the blade, which reduces the wear rate by 40% when drilling in hard strata such as sandstone and weathered rock. Even if the operation is continuous, the structure can be kept stable and the fracture caused by material fatigue can be avoided.

Full-specification adaptation system, covering multi-scene drilling requirements

Provide 150mm-1200mm full range of drilling diameter specifications, precisely adapt to 3-30 tons of various types of excavators, compatible with Carter, Komatsu, Sany, XCMG and other 20 + mainstream brands.Special drill bits are designed for different operation scenarios: standard blade drill bit for ordinary soil layer, reinforced toothed drill bit for hard rock formation, and shallow hole high-efficiency drill bit for tree planting scenario, to ensure that each working condition can achieve the best drilling effect.

Hydraulic stepless speed regulation, drilling efficiency increased by 60%

Equipped with precision hydraulic drive system, it supports 0-300 rpm stepless speed regulation, and can adjust the speed in real time according to the geological hardness.High-speed dumping mode (200-300 rpm) is used in soft soil areas, and low-speed high-torque mode (80-150 rpm) is used in hard rock areas to avoid sticking and shutdown.With the optimized spiral angle design, the dumping efficiency is increased by 30%, and the single hole forming time is shortened by more than half compared with the traditional equipment.

Quick installation structure + long-term quality assurance to reduce the comprehensive use cost

With the standardized quick-release connection interface and the design of positioning pin and safety lock catch, a single person can complete the installation and disassembly in 10 minutes, which reduces the switching time of equipment.All parts are guaranteed for 18 months, and the core part of the drill pipe is guaranteed for 24 months, far exceeding the industry standard.Equipped with self-lubricating bearings and anti-clogging channels, the frequency of daily maintenance is reduced by 50%, and the comprehensive cost of long-term use is 30% lower than that of similar products.

YA80000 High Quality Suitable Hydraulic Earth Drill Excavators Spiral Utility Work Digga Auger Excavator Auger Drill

As the key equipment of engineering drilling operation, Excavator Auger is the core bridge connecting the power of excavator and the demand of drilling. Its performance directly determines the drilling efficiency, engineering quality and construction safety, and occupies an irreplaceable important position in modern engineering construction.

From the perspective of construction efficiency, excavator auger has completely changed the inefficient predicament of traditional drilling methods.In foundation piling, pipeline embedding and other projects, the traditional manual drilling or small equipment has less than 10 holes per day, while the excavator equipped with professional auger can achieve 30-50 standard holes per day, and the efficiency is increased by 3-5 times.Especially in large-scale afforestation, photovoltaic power station foundation and other projects requiring intensive drilling, its efficient performance directly determines whether the project can be delivered on schedule, and becomes the core guarantee to shorten the construction period.

FAQ

How many tons of excavators should be used with the excavator auger?

Our excavator auger covers a full range of excavators of 3-30 tons, which can be selected according to the drilling diameter: 150-300 mm small diameter drill bit is suitable for 3-8 tons excavator, suitable for tree planting and small foundation operations; 400-800 mm medium diameter drill bit is suitable for 10-20 tons excavator, used for municipal pipelines and photovoltaic pile foundations;The 900-1200 mm large-diameter drill bit shall be equipped with an excavator of more than 20 tons to meet the drilling requirements of large infrastructure foundation.
The drill bit shall be matched according to the geological hardness: the standard spiral blade drill bit can be selected for common clay and loam, which has high soil discharge efficiency; the reinforced wear-resistant drill bit is recommended for sandstone and weathered rock strata, and the alloy teeth are welded on the blade edge to improve the wear resistance; the tooth-shaped crushing drill bit shall be selected for hard rock or gravel-containing strata, which can reduce sticking through the dual effects of cutting and crushing;A special drill for shallow holes is recommended for tree planting scenarios to optimize the blade angle and reduce the amount of soil.
No complex modification is required.The equipment adopts standardized hydraulic interface and mechanical connection structure. It only needs to disassemble the original bucket of the excavator, connect it with the small arm through the pin shaft, and then connect the corresponding hydraulic pipeline.Equipped with a special quick-release device, a single person can complete the installation and commissioning in 10-15 minutes, without affecting the use of other functions of the excavator after installation, so as to achieve rapid switching of operation modes.
In case of sticking, stop drilling immediately, rotate the drill bit reversely for 2-3 circles and then lift it slowly. Do not continue drilling by force.Attention shall be paid to the following points to prevent sticking: geological survey shall be carried out before operation, and the rotating speed of hard rock stratum shall be reduced and the breaking bit shall be used; feed shall be kept at a uniform speed to avoid sudden increase of downforce; mark and avoid underground obstacles in advance; regularly clean the soil winding on the blade to keep the dumping channel unblocked.

Our Latest Blog

Top 5 Applications of Excavator Augers in Construction and Landscaping

28

Aug

Top 5 Applications of Excavator Augers in Construction and Landscaping

.blog-content h2 { margin-top: 26px; margin-bottom: 18px; font-size: 24px !important; font-weight: 600; line-height: normal; } .blog-content h3 { margin-top: 26px; margin-bottom: 18px; font-size: 20px !important; font-w...
View More
How to Choose the Right Excavator Auger for Your Project

28

Aug

How to Choose the Right Excavator Auger for Your Project

.blog-content h2 { margin-top: 26px; margin-bottom: 18px; font-size: 24px !important; font-weight: 600; line-height: normal; } .blog-content h3 { margin-top: 26px; margin-bottom: 18px; font-size: 20px !important; font-w...
View More
How to Choose the Right Crusher Bucket for Your Excavator

28

Aug

How to Choose the Right Crusher Bucket for Your Excavator

.blog-content h2 { margin-top: 26px; margin-bottom: 18px; font-size: 24px !important; font-weight: 600; line-height: normal; } .blog-content h3 { margin-top: 26px; margin-bottom: 18px; font-size: 20px !important; font-w...
View More
Real-World Applications: Crusher Buckets in Mining, Demolition, and Recycling

28

Aug

Real-World Applications: Crusher Buckets in Mining, Demolition, and Recycling

.blog-content h2 { margin-top: 26px; margin-bottom: 18px; font-size: 24px !important; font-weight: 600; line-height: normal; } .blog-content h3 { margin-top: 26px; margin-bottom: 18px; font-size: 20px !important; font-w...
View More

What Our Clients Are Saying

Mr. Daniel
Mr. Daniel

In the past, small drilling rigs were used in the drilling operation of municipal pipeline laying, with up to 15 holes drilled every day, and drilling was often stuck in hard soil layers.With this excavator auger installed on a 15-ton excavator, the soft soil area can drill more than 40 holes a day, and even the sandstone stratum can be drilled steadily.Drill bit dumping is particularly smooth, the hole wall is flat and does not collapse, the accuracy of pipeline embedding has been improved a lot, and the construction period has been directly shortened by one third.

Mr. Hans
Mr. Hans

The base has to plant tens of thousands of saplings every year, and it used to be slow and tiring to hire people to dig holes.Since the auger suitable for 6 tons of small digging was used, the single-operator excavator can dig more than 300 standard tree pits a day, the aperture and depth are particularly uniform, and the survival rate of saplings has been improved.The wear resistance of the drill bit exceeded expectations, and after six months of continuous use, the blades were hardly worn, which saved 70% of the cost compared with hiring people.

Mr. Raj
Mr. Raj

The foundation of photovoltaic power plant needs intensive drilling, and the traditional drilling rig can not stand the weathered rock stratum on our side.This reinforced auger is equipped with a 20-ton excavator, which can easily drill through hard rock in low speed and high torque mode, and the time of single hole formation is controlled within 5 minutes.The key is that the verticality of drilling is particularly good, the accuracy of pile foundation installation has increased from 80% to 99%, and the supervision acceptance has passed once, and there is no rework problem.

Mr. Carlos
Mr. Carlos

The slope greening of expressway needs to drill holes and plant trees on steep slopes, and the risk of manual operation is too high.This auger is installed on the telescopic boom excavator, which can accurately extend to any position of the slope, and the angle adjustment is flexible.When drilling on the slope of 30 degrees, the soil is discharged smoothly without stuttering, and more than 200 trees can be planted in one day.The equipment is light and easy to install, and the masters of the maintenance team say that it is much better than the previous special equipment.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000
Why Choose Us

Why Choose Us

Core Product Highlights and Brand Advantages of Excavator Auger,he blade edge is coated with a tungsten carbide wear-resistant layer, which reduces the wear rate by 50% when working in hard strata such as sandstone and weathered rock, and keeps the structure stable after 500 hours of continuous drilling.Through the low temperature impact test at -40 ℃, the brittle fracture problem will not occur in extreme climate, which ensures the operation reliability of various complex geological scenarios.